One Call for the Electrical and AV in Your New Home
Let Us Field the Texts While Your Home Goes Up
It’s 7:15 on a Tuesday morning, and your phone buzzes. Your builder wants to know if the TV wall is wired, because drywall starts Monday. Your designer asks if the keypads should match the wall color. A supplier needs a delivery date for the speakers. If you’re building a custom home across the DMV, you know how fast the questions pile up, and you may not know the answer to half of them. That’s a lot to carry while you’re also picking tiles.
When one integrator handles the electrical and the AV, those texts come to us instead of you. Here’s how it works, from the first set of drawings to the walk-through before you move in. See it in action in our latest Facebook post.
Why Do So Many Questions Come Up During Your Build?
Because technology doesn’t belong to one trade. The electrician pulls the wires, the framer sets the walls, the designer picks the finishes, and someone has to decide where the TV, speakers, and keypads go. Most of those questions are small, but they add up fast. When no one owns them, the questions bounce around until they land on you.
Timing constraints make it worse. Once drywall goes up, every cable that got left out becomes a hole in a finished wall. If the drawings don’t show a TV or in-ceiling speakers, the electrician wires a standard electrical layout, and the AV gets sorted out later at a much higher price. That’s how a project that was on budget picks up change orders and delays. Our post on avoiding costly change orders shows how planning the electrical and the design together prevents them.
What Do We Handle Before the Walls Close?
It starts while the plans are still on paper. We sit down with you, your builder, and your designer and mark where everything goes, so the technology fits the room. We also flag anything that needs your decision early, so you aren’t choosing a keypad finish the week before move-in.
Nobody wants a speaker grille in the middle of a stone wall that was never in the rendering. Our post on designing technology to disappear into the architecture shows how that plays out. We handle the electrical side too, so there’s one contractor for electrical and AV.
Then we show up at rough-in, when the wiring goes into the open walls. We work with your electrician so every box and cable ends up where the plan says it should, and we check the walls before they close. When your builder asks whether the wiring is done, we send a photo of the open wall and let them know when it’s ready for inspection.
What Does That Mean for You?
Your phone gets quieter. The designer’s keypad question comes to us, and we come back with a finish and a location instead of a thread of replies. The supplier’s delivery date gets worked out with us, so you’re not stuck in the middle of a three-way text. The electrician already knows where to run the cable, because the answer to “Where does this box go?” is on the plan.
Before you move in, we program the system and walk you through it. That’s our job on a build like this. We take care of the texts so you can enjoy the fun part: a finished home that works the way you pictured it.
If your home is in the design or framing stage, contact our team, and we’ll review the plans with you. The drawings don’t have to be finished. You can also visit our showroom by appointment and see the technology solutions we offer in person.
When you subscribe to the blog, we will send you an e-mail when there are new updates on the site so you wouldn't miss them.
